We will give best providers and high top quality items with all sincerity. If you are interested in any of our goods or would like to examine a likely purchase, remember to feel totally free to contact us. In 2000, EPG took the lead in getting ISO14001 environment administration certification and thereafter handed the inspection of cleanse manufacturing and recycling economic system, profitable the title of “Zhejiang Environmentally friendly Organization”. EPT EPT hardened steel planetary EPTT EPT
Surface area colonAs your necessity
EPT colonSteel sol EPT sol brass sol iron sol copper sol bronze sol EPTTium sol ss sol EPT metal sol EPT comma teflon comma plastic
Any other content and dimension relies upon on clients apos demand time period
EPT Alloy Steels sol EPTT sol Brass sol Bronze AlloEPTTEPTT Steel sol Copper sol Stainless Steel sol Resource Steel
Cold Rolled Steel sol EPTT Steel
Specification | Customized manufactured sol OEM |
Our attributes | one period17 many years heritage 2 periodShort direct time 3 periodGood after-sale service four periodFree samples presented |
EPT | Stainless metal comma copper comma brass comma carbon steel comma EPT lparaccording to consumer aposs necessity period of time |
Surface area Remedy | Zn-plating comma Ni-plating comma Cr-plating comma Tin-plating comma copper-plating comma the wreath oxygen resin spraying comma the warmth disposing comma hot-dip galvanizing comma Black oXiHu (West EPT) Dis.de coating comma painting comma powdering comma shade zinc-plated comma blue black zinc-plated comma rust preventive oil comma EPTTium alloy galvanized comma silver plating comma plastic comma Electroplating comma anodizing etc period |
Principal EPT | EPT screw commabolt comma nuts commafastener commaknob commapins comma bushing comma sleeve commaEPT comma stamping components commawasher commagasket commaplastic molding EPT areas commastandoff commaCNC machining services commaaccessories and so forth interval |
Producing EPT | CNC EPTT comma computerized lathe EPTT commastamping EPTT commaCNC milling EPTT commarolling EPTT commalasering commatag grinding EPTT and so on interval |
Management Technique | ISO9001 – 2008 |
Offered Certification | RoHS comma SGS comma EPT Certification |
Tests EPT | Projecting apparatus comma Salt Spray Examination comma Durometer comma and Coating thickness tester comma 2d projector |
EPT time | 10-15 working daEPTTas normal commaIt will based mostly on the in depth orEPTTquantity period of time |
Taking care of Returned Products | With quality difficulty or deviation from drawings |
Shipping of Samples | By DHL commaFedex commaUPS comma TNT commaEMS Hat Hat |
Warranty | Alternative at all our EPT for rejected items |
Main Markets | North The us comma South The us comma EPTern Europe comma West Europe comma North Europe comma South Europe comma Asia |
How to purchase | ast You ship us drawing or sample |
ast We carry by means of project assessment | |
ast We give you our design for your affirmation | |
ast We make the sample and send it to you after you verified our design | |
ast You validate the sample then location an orEPTTand shell out us thirty percnt deposit | |
ast We start producing | |
ast When the merchandise is done comma you pay out us the equilibrium soon after you verified photographs or tracking figures period | |
ast EPT is accomplished comma thank you excl excl | |
Applications | Toy commaEPTT comma instrument comma EPT equipment comma EPTT EPTs comma furnishings comma mechanical products comma daily dwelling products comma digital athletics gear comma LigEPTT market products comma sanitation EPTTry comma market place sol hotel gear supplies comma artware and so forth period |