In 2000, EPG took the lead in gaining ISO14001 setting management certificate and thereafter passed the inspection of thoroughly clean generation and recycling economic climate, winning the title of “Zhejiang Environmentally friendly Business”. Retaining in head that very good service is the key to cooperating with customers, we strive to meet substantial high quality expectations, provide competitive charges and make certain prompt delivery. focus in electrical power transmission items, CATV products, mechanical seal, hydraulic and Pheumatic, and advertising goods.
involute duplicate precision EPTT EPT plastic worm helical EPT
Merchandise | EPTT EPTTd EPT plastic EPTs |
Craft Approach | Plastic Injection or CNC machining |
Plastic Granules |
UL, Food and drug administration, RoHS etc. |
EPTT EPTT | ISO9001 and ISO14001 |
Molds EPT | S316,H13,718,738,P20,H13,420SS |
Mildew EPT | 300,000 photographs or one,000,000 shots or much more |
Mold Cavity | One-cavity or two cavities or Multi-cavity |
EPT | Nylon, PA66, NYLON with thirty% EPT fibre, Abdominal muscles, PP,Personal computer,PE,POM,PVC,PU,TPR,TPE,TPU,PA,PET,EPTTPE,PMMA and many others. |
Molds cavity Hardness | 60 to 90 H.R.C |
Size/EPTT | EPTs and components proportions are in accordance to drawings from customer, and colors are EPT |
Surface remedy | PoEPTTd or matte surface, painting, texture, EPT aluminizing and can be stamped with logo and so on. |
Measurement Tolerance | plusmn0.05mm or more precise |
Perform Movement chart | Step1: Make tooling to start with and usual want two~~three months. Step2: Make and confirm samples. Step3: One particular 7 days for mass production usual. |
Samples confirmation and approval | Totally free samples delivered for confirmation and transport EPT paid by buyers |
Deal | Internal distinct plastic bag/outside the house carton/wood pallets/ or any other EPTT package as per customer’s needs. |
Shipping Time | Total normally takes 2~~4weeks usual |
Payment Terms | PAYPAL, T/T, Western EPT |
EPT | Normal FEDEX, UPS, DHL, TNT, EMS or base on customer’s need. |
FAQ
Q1: How to promise the EPTT of EPTs and components?
We are ISO 9001:2008 qualified manufacturing facility and we have the integrated method for EPTT parts good quality manage. We have IQC (incoming good quality management),
IPQCS (in approach good quality manage EPT), FQC (final good quality handle) and OQC (out-heading top quality control) to manage every procedure of EPTT parts prodution.
Q2: What are the Edge of your EPTs and components?
Our edge is the aggressive and reasonable costs, fast supply and high good quality. Our eployees are responsible-oriEPTTd, welcoming-oriEPTTd,and dilient-oriEPTTd.
Our EPTT parts goods are highlighted by strict tolerance, smooth complete and EPTT-life performance.
Q3: what are our machining equipments?
Our machining equipments incEPTT plasticn EPT machinies, CNC milling EPTTs, CNC turning EPTTs, stamping EPTTs, hobbing EPTTs, automatic lathe EPTTs, tapping EPTTs, grinding EPTTs, reducing EPTTs and so on.
This autumn: What shipping waEPTTdo you use?
EPTTly, we will use UPS DHL or FEDEX and sea shipping and delivery
five: What supplies can you process?
For plastic EPT EPTs and parts, the materials are Nylon, PA66, NYLON with 30% EPT fibre, Abdominal muscles, PP,Pc,PE,POM,PVC,PU,TPR,TPE,TPU,PA,PET,EPTTPE,PMMA and so forth.
For steel and machining EPTs and components, the materials are brass, bronze, copper, stainless metal, metal, EPT, EPTTium plastic and so forth.
Q6: How EPTT is the Delivery for Your EPTs and elements?
EPTTly , it will just take us fifteen operating daEPTTfor EPT or machining, and we will try out to shorten our lead time.